Yellow Snake, Kwekwe
Yellow Snake, Kwekwe — 100 t/day CIP plant
A 100-ton-per-day carbon-in-pulp plant — foundations, tanks, mill, and circuit delivered on the ground at Yellow Snake.
The works
Elandridge delivered a 100 t/day CIP plant at Yellow Snake, Kwekwe. The works run from the pad up: foundations and masonry, tanks erected on the circuit, then mill, walkways, and the plant in place.
01
Foundations
The plant starts in the ground. Pit, blockwork, and a concrete pad so tanks and mill have something true to sit on — not steel on raw earth.
02
Tank installation
Tanks go up on the pad: conical adsorption vessels, leach tanks, stairs, and walkways. An excavator on site to place steel that is too heavy to manhandle.
03
CIP circuit
A 100 t/day carbon-in-pulp circuit: tanks, mill, walkways, and power. This is the plant at Yellow Snake — steel in the ground, not a paper layout.